Vineyard Crest · Kenmore, WA
Vineyard Crest Fence Guide: HOA Approval in Kenmore
Every new fence in Vineyard Crest needs written approval from the association before work starts. Here's what the recorded CC&Rs say, who maintains the perimeter fence, and how Kenmore's permit rules fit in.
Not affiliated: SeattleFence is an independent fence contractor. We are not affiliated with, endorsed by, or speaking for the Vineyard Crest Homeowners Association. Only the association and the City of Kenmore can decide what's allowed on your lot.
What the association is
The Vineyard Crest CC&Rs were recorded in King County on January 15, 2003, by CamWest Development, Inc. They cover property in the City of Kenmore known as Vineyard Crest, platted as the Berry Property Plat.
The declaration defines a Lot as any of the 38 numbered lots on the recorded plat. It creates the Vineyard Crest Homeowners Association to handle maintenance and architectural control.
The association's FAQ says volunteer officers and Architectural Control Committee (ACC) members run it.
Recorded fence rules
The CC&Rs define a "Structure" to include any fence or wall. Article 5 puts every new or altered Structure under ACC review.
| Topic | What the CC&Rs say (section) |
|---|---|
| Approval needed | Fences and hedges are Structures that need Board or ACC approval; no work before written approval (5.1.1) |
| Timing | Submit in duplicate 30+ days before start; deemed approved if no decision in 30 days (5.1.3) |
| ACC discretion | May refuse any design, plan, or color visible from a street or Lot, including on aesthetic grounds (5.1.5) |
| Neighbors' outlook | ACC may weigh a structure's effect on the view or outlook of surrounding Lots (5.1.6) |
| City compliance | Structures must meet the Plat and building codes; ACC may ask for proof of permits (5.1.11); setbacks apply (6.15) |
| Screened areas | Fenced or screened service areas must match the home and get prior ACC approval (6.22) |
| Published height or materials list | None in the CC&Rs; 5.1.10 lets the ACC adopt guidelines, but none are posted on the site |
HOA perimeter and split-rail fencing
CC&R Section 2.11 says the declarant installed fencing along the north, south, and west property lines, within the recreation/drainage tract (Tract F), and along the guardrail next to the sensitive area tract (Tract E). The association has full responsibility for maintaining, repairing, and replacing that fencing.
The same section says the declarant installed split-rail fencing, as required by the City, between the sensitive area tract and Lots 6, 7, 8, and 38. The owner of the lot on or next to that fence maintains it.
Section 2.12 adds that the association maintains the landscape strip in the public right-of-way along 84th Avenue NE, west of the perimeter fencing.
Fence styles to consider
The CC&Rs don't list approved styles. These cedar options are SeattleFence planning suggestions, not association-approved designs.
| Style | Look | Privacy | Planning note |
|---|---|---|---|
| Picture frame cedar | Boards framed by a top rail and trim | High | Finished look from both sides. Submit style and stain for ACC review. |
| Solid cedar privacy | Vertical cedar boards | High | Straightforward privacy. The CC&Rs publish no fence height; ask the ACC. |
| Horizontal cedar | Horizontal boards, modern lines | High | A style change from neighboring fences is not in-kind, so it needs approval. |
Photos show SeattleFence projects elsewhere in the area, not any Vineyard Crest home or fence.
Approval timeline
Plan on two separate checks: the Vineyard Crest ACC and the City of Kenmore. SeattleFence doesn't issue either one.
Read CC&R Section 5.1
The association's home page points owners to Section 5.1, Construction & Exterior Alterations or Repairs. Section 5.1.1 lists fences and hedges as Structures that need approval.
Decide if it's in-kind
Repairing or replacing in-kind generally doesn't need a request, per the association's home page. A new fence, or a change in style or color, does.
Send a complete request
The FAQ asks for who you are, the address, details, scope, and timeline, and the home page suggests a large sample of the style or color. CC&R 5.1.3 says to submit at least 30 days before your start date.
Board and ACC review
The FAQ says the Board reviews, then the ACC. CC&R 5.1.3 sets a 30-day window, after which the ACC is deemed to have approved. The ACC may require proof of any City permits under 5.1.11.
Check Kenmore, then build
Confirm whether the fence is over 8 feet or near a tract, critical area, or buffer, then build only after written ACC approval.
Kenmore's permit rules
Kenmore Municipal Code 15.30.205 exempts fences not over eight feet high from a building permit. The exemption doesn't apply within critical areas, shorelines, associated buffers, or native growth protection areas such as tracts.
The City's Do I Need a Permit? page repeats that work in those areas may not be exempt. It adds that an exemption doesn't authorize work that violates City codes.
Vineyard Crest fence-guide questions
Is Vineyard Crest a real HOA in Kenmore?
Yes. The recorded Declaration of Covenants, Conditions, Restrictions, and Reservations for Vineyard Crest (platted as Berry Property Plat), recorded in King County on January 15, 2003, covers property in the City of Kenmore and names the Vineyard Crest Homeowners Association. It defines a Lot as any of the 38 numbered lots on the recorded plat. SeattleFence is not affiliated with the association.
Do I need ACC approval to build a fence in Vineyard Crest?
Yes. CC&R Section 5.1.1 says all Structures, expressly including fences and hedges, must be approved by the Board or an Architectural Control Committee before they are built or altered, and work may not start until the ACC gives written approval. The association's home page also lists fences among changes to submit to the ACC before work begins.
How long does ACC review take?
CC&R Section 5.1.3 says plans go in, in duplicate, at least 30 days before the planned start date, and if the ACC doesn't approve or disapprove within 30 days it is deemed to have approved. The association's FAQ says approval can take up to 30 days but is typically faster, and approved requests get an official approval kept on file.
Do I need approval to repair or replace a fence the same way?
The association's home page says that, generally, maintaining, repairing, or replacing in-kind doesn't need a change request, but a change in color or style, or a new structure, does. When in doubt, ask the ACC.
Who maintains the perimeter fence?
CC&R Section 2.11 says the declarant installed fencing along the north, south, and west property lines, within Tract F, and along the guardrail next to Tract E, and the association has full responsibility for maintaining, repairing, and replacing it. Owners of Lots 6, 7, 8, and 38 maintain the split-rail fence the City required between the sensitive area tract and those lots.
Does Kenmore require a permit for a fence?
Kenmore Municipal Code 15.30.205 exempts fences not over eight feet high from a building permit, unless the work is in a critical area, shoreline, associated buffer, or native growth protection area such as a tract. The City's Do I Need a Permit? page says work in those areas may not be exempt and that exemptions don't override other code requirements.
Can SeattleFence get my fence approved?
No. Only the Vineyard Crest Board or ACC can approve a fence under the CC&Rs, and only the City of Kenmore decides city requirements. SeattleFence can provide a written scope, a site sketch, and material, height, and color details for your ACC request.
Get a quote for your Vineyard Crest lot
Tell us the address, approximate length, style, target height, and stain color. We'll price the fence and give you a written scope and sketch for your ACC request.
Get Your Free Vineyard Crest Fence Quote
Get In Touch
Fill out the form and we'll get back to you shortly.
Prefer to talk? Call (253) 766-5854
Sources
Every association and city claim on this page comes from one of these public documents. Rules change, so read the current CC&Rs and confirm city rules before you build.
- Declaration of Covenants, Conditions, Restrictions, and Reservations for Vineyard Crest (PDF, recorded King County 20030115001483), linked from the association's CC&Rs page
Property in the City of Kenmore, King County, platted as Berry Property Plat; declarant CamWest Development, Inc.; 38 numbered lots; plat recorded under Recorder's File No. 20020821001927. Definition of Structure (includes fence and wall). Section 2.1 common areas (Tract E sensitive area tract, Tract F recreation/drainage tract). Section 2.11 perimeter fencing maintained by the association; City-required split rail between Tract E and Lots 6, 7, 8 and 38 maintained by those owners. Section 2.12 landscape strip along 84th Avenue NE west of the perimeter fencing. Sections 5.1.1–5.1.3, 5.1.5–5.1.6, 5.1.10–5.1.11 on ACC approval, the 30-day review, aesthetic discretion, view/outlook, guidelines, and permits. Section 6.15 governmental and setback compliance. Section 6.22 fenced or screened service areas need ACC approval.
- Vineyard Crest HOA — Covenants, Conditions & Restrictions page
Publishes the CC&Rs PDF; identifies the association's Kenmore, WA mailing location.
- Vineyard Crest HOA — home page
Fences are among changes to submit to the ACC for approval before work begins; in-kind maintenance, repair, or replacement generally doesn't need a request, but color, style, or new-structure changes do; points owners to CC&R Section 5.1.
- Vineyard Crest HOA — Frequently Asked Questions
Requests should include the property, details, scope, and timeline; reviewed by the Board then the ACC; approval can take up to 30 days but is typically faster; approvals are issued officially and kept on file; the HOA is run by volunteer officers and ACC members.
- City of Kenmore — Do I Need a Permit?
Work in critical areas, shoreline areas, native growth protection areas (such as tracts), and their buffers may not be permit-exempt; exemptions don't authorize work that violates City codes.
- Kenmore Municipal Code 15.30.205 — Work exempt from permit
Fences not over eight feet high need no building permit, provided they are not within critical areas, shorelines, associated buffers, or native growth protection areas (e.g., tracts).